Location: Zaxo Client: DNO
Description:
BiHorns team was responsible to lay a Single-mode 24 core fiber optic cable for 3.4 KM between DNO new site(P1) and their central facility to transfer the instrument’s data to be monitored and controlled from the main CCR.
The cable contains 3 joints along the path and an air blower has been used to blow the cable inside the existing conduit.
Recent Comments